Printable quote review
Sump Pump Installation Quote Checklist
Use this checklist before accepting a contractor bid so pump equipment, basin work, labor, discharge, electrical, permits, cleanup, and waterproofing add-ons stay visible.
Scope lines
Eight lines to ask every contractor to price
Quote review
Contractor quote checklist
Check these items while reading each bid or during the walkthrough before the quote is finalized.
Equipment
Pump and basin
Install scope
Labor and discharge
Code items
Electrical and permits
Risk review
Waterproofing add-ons
Keep separate numbers for pump equipment, basin work, discharge routing, labor, electrical, permits, cleanup, and waterproofing add-ons before comparing bids.
Copy-ready request
Send this scope note before the walkthrough
Select the text below and paste it into an email or quote request form.
FAQ
Sump pump quote checklist FAQ
Use these answers to keep contractor bids comparable before approving pump, basin, discharge, electrical, or waterproofing work.
What should a sump pump quote separate?
A useful quote separates the pump model, basin or pit work, labor, discharge routing, electrical responsibility, permits, cleanup, testing, and any waterproofing recommendations.
Planning ranges are not a substitute for local plumbing, electrical, permit, or waterproofing review.
How do I compare two contractor bids?
Compare the same scope lines side by side before comparing totals. A cheaper bid may omit a check valve, basin lid, GFCI outlet, permit handling, or debris disposal.
Should waterproofing be part of the pump quote?
Waterproofing add-ons should be written as a separate recommendation, especially when recurring water, perimeter drainage, wall seepage, or finished-basement risk is involved.
Can I ask for pump brand and warranty in writing?
Yes. The written bid should name the pump style, horsepower, warranty, backup system if included, and any substitutions allowed before installation day.